-------------------- R22 Gas Replacement |
R22 Gas Replacement During 2010 R22 gas will no longer be available, although R22 reclaimed gas will still be available it will become scarce. Therefore, as existing R22 equipment will be over 10 years old by 2010, it would be prudent to consider a change to a system based on 410A or R407C in the near future. We are able to carry out a health check on existing air conditioning systems and provide advice regarding keeping existing equipment or upgrading.
|
|||||||||
![]() |
||||||||||