C4L Data Centre

QIComm Data Centre

Rapidswitch Data Centre

Axil Europe

Cemex Egham Computer Room

Park Royal London Data Centre

Paris Data Centre

Heathrow Data Centre

Victoria London Data Centre

Swindon Generator Install

 


 

Handover of phase 1 of the data centre.

The installation is demonstrated, including generator / mains power change over, fire detection and suppression system, electrical and mechanical systems.
Operation and maintenance manuals handed over.

The data centre will be monitored remotely by an environmental management system EMS which will give early warning of abnormal temperature or humidity readings.

Data centre.

Showing part of the access ramp and air aspiration VESDA very early smoke detection apparatus.

Main switchgear and UPS system is located within a separate switchroom within the basement.

Data centre main floor area.

First phase of the data centre completed, showing FM200 fire suppression system, dual feed power distribution unit, CRAC unit and ceiling mounted smoke detection units.

Installation of floor.

Installation of a new heavy grade computer room floor, which will allow a cooling path for the air conditioning units and provide containment for data and power cabling.

Preperation of the room.

Fire rated partition and a new MF ceiling are installed.
Floor is painted in preparation for the heavy grade computer room floor.

Stripping out office area.

Floor tiles, ceiling and existing electrical and mechanical services are removed, and made safe.

General office area before works begin.

The area is inspected to access its suitability, walls ceiling and floor have to be fire rated, adequate ceiling height is needed for racks, cooling and sub floor service runs.

handover of data centre to c4l
completed data centre
data centre before construction
completed data centre showing fm200 gas fire suppresion
stripping out office to form data centre floor
data centre fire rated partition
installation of data centre raised floor
data centre air handling unit switchgeardata centre power board


C4L Bournemouth, www.c4l.co.uk

Construction of a data centre within one floor of a multi tenant office block for C4L.
The installation was completed on time, within budget and the first phase of the project handed over to the client in December 2009

Phill Wrightson of C4L -" many thanks for your help so far with everything, certainly has been an eye opening project for me and I hope I haven’t caused too many problems for you! I am very happy with the final outcome of the facility and look forward to working with you again in the future".

ITE Projects Logo

Home Page

Contact ITE

Work Summary

Case Studies

Site Map

Data Centre Build - Case Studies

ITE Projects Ltd

3 Fleet Business Pk
Sandy Lane
Church Crookham
Fleet
Hampshire
GU52 8BF

Tel:01252 811441
Fax:01252 811952

Case Study Links
Code of conduct for data centres
ITE Projects Ltd. Page Updated 17.02.2012
Company Registration No. UK 5098806. 1 & 2 The Barn, Oldwick, West Stoke Road, Lavant, Chichester, PO18 9AA.
(All photographs used are from ITEs own projects)
NIC EIC Logo