ITE Projects Ltd
Design and Build Computer Rooms,
Data Centres and Internet Communication Centres

ITE Projects Ltd
3 Fleet Business Park
Fleet, Hampshire,UK
Please phone for advice or information +44 (0)1252 811441


Home Page

Contact ITE

Work During 2005

Work During 2006



Computer Room Design

Computer Room Build

Data Centre Build

Case Studies

Suite Fit Out Works

Service & Maintenance

ITE Clients

Computer Room

Case Studies, Large Data Centres

Telehosting Site, Heathrow

Conversion of an existing warehouse into a telehosting facility
This included the installation of 1000kVA & 2000kVA generators, 3 x 500kVA ups, Glycol free cooling, installation of a mezzanine level to increase capacity to 50,000 square feet. Fit-out of offices, reception and door entry / security system, fire detection and Hi-Fog fire extinguishing system.

Shown below: Main Comms Area, Control Room, Reception

Comms Room, London Victoria

One of the uppermost floors of an office block in Victoria converted to a comms room

Project comprised of a 200kVA UPS, 500kVA generator located on the roof and 13 No. D.X. cooling units. The project required protracted negotiations with landlord, client and Westminster council for road closures and equipment delivery.

Shown below: Main comms room nearing completion. Test area. Generator Installation

Telehosting Site, Paris

Conversion of an existing warehouse into a telehosting facility.
This included the installation of 3 x 2mVA generators and 5 x 500kVA UPS, Glycol free cooling, full mezzanine level, refurbishment of offices and reception with comfort cooling.

Shown below: Exterior of building showing control area, and main switchroom

.

Telehosting Site, Dusseldorf

Conversion of an existing manufacturing plant to a telehosting facility
Built to German building standards, the project comprised of extensive building works to both interior and exterior of the building. 2 x 2mVA generators, 5 x 500kVA UPS, Glycol free cool air conditioning, Hi-Fog fire suppression system with fire detection system to regional standards. Full fit out of offices, reception and control areas including security / access control systems. Site area approximately 35,000 square feet.

Shown below:. . Main commputer room,
Reception area, UPS area

Computer Room Air Conditioning
Glycol Free Cool
Direct Expansion
Chilled Water

Computer Room Power
UPS Backup Systems
Generator Support
48 Volt Systems

Fire Detection & Suppression
Fire Detection Systems
FM200
Hi-Fog
Air Aspiration

Building Works
Computer Room Floor
Partition & Doors
Suspended & MF Ceiling

Computer Room Security
Door Entry Systems
CCTV
Security Fencing

Leak Detection Systems

© ITE Projects Ltd 2008
Company registration number 5098806
1 & 2 The Barn, Oldwick, West Stoke Road, Lavent, Chichester, PO18 9AA

Computer Room Design, Server Room Design, Computer Room Air Conditioning,Computer Room Fire Detection, UPS Backup, Generator Installation, Data Centre Design, Computer Room Build