Data Centre Power

Data Centre Design

Data Centre Build

Data Centre Fire Detection

Data Centre Air Conditioning & Cooling


 

data centre switchgearcircuit breakers for

 

TIA-942 was introduced in 2005 with the intention of addressing data centre infrastructure. The document sets out 4 levels of power availability, ranging from:-

Tier 1 - 99.671% availability - Single distribution path - no equipment redundancy
Tire 2 - 99.741% availability - Single distribution path - n+1 equipment redundancy
Tier 3 - 99.982% availability - Dual distribution paths - n+1 equipment redundancy
Tier 4 - 99.995% availability - Dual systems, both active - n+1 equipment redundancy

We have designed and built data centres up to tier 4 standard, incorporating multiple redundant power supplies. However, most tend to be a tier 2 system but with added distribution paths to increase the resiliency of the site.

 

ITE Projects Logo

Home Page

Contact ITE

Case Studies

Work Summary

Site Map

Data Centre Power

ITE Projects Ltd

3 Fleet Business Pk
Sandy Lane
Church Crookham
Fleet
Hampshire
GU52 8BF

Tel:01252 811441
Fax:01252 811952

Data Centre Links
Code of conduct for data centres
ITE Projects Ltd. Page Updated 17.02.2012
Company Registration No. UK 5098806. 1 & 2 The Barn, Oldwick, West Stoke Road, Lavant, Chichester, PO18 9AA.
(All photographs used are from ITEs own projects)
NIC EIC Logo