ITE Projects Ltd
Design and Build Computer Rooms,
Data Centres and Internet Communication Centres

ITE Projects Ltd
3 Fleet Business Park
Fleet, Hampshire,UK
Please phone for advice or information +44 (0)1252 811441


Home Page

Contact ITE

Work During 2005

Work During 2006



Computer Room Design

Computer Room Build

Data Centre Build

Case Studies

Suite Fit Out Works

Service & Maintenance

ITE Clients

Computer Room

Work During 2005

 

Work completed/underway 2005

  • November - Work has started on a new computer room / comms centre for Cemex (RMC) headquarters building in
    Egham, Surrey.
    Includes: UPS, close control air conditioning, fire detection & suppression system, cable management, lighting, raised floor,
    fire rated partition / doors, suspended ceiling, and include extra measures to prevent high and low level water ingress into
    the computer room facility.

  • October - Upgrading the power capacity of a data centre in west London. Includes new generator, transformer and ring main
    unit with associated switchgear, cabling and building works.

  • September - installation of a new PACS server room for Basingstoke hospital All work completed to a very tight schedule and now handed over to client.

  • ITE have completed a number of suite fit outs during the first half of 2005, each of which include :-
    Fire rated partitions and doors.
    Installation of PDUs with power run outs to racks.
    Reconfiguring fire alarm and fire suppression equipment.

  • Construction of a steel framed mezzanine level within an existing comms facility. This enabled the construction of an additional computer suite.

  • Upgrading and overhauling the lighting within a Carphone Warehouse comms site.

  • June - July: Phase I, Increasing the power capacity of an existing telehosting facility by converting a store area into a UPS / Switchgear room, the project comprised of adding a 2mVA generator, 4 new 300 kVA UPSs, associated switchgear, cooling and fire suppression / detection.

  • August: Phase 2, of the same project is includes a new outbuilding to house a transformer, ring main unit and H.V. L.V switchgear. with additional cooling. Phase I & II completed November.
    Shown below: Images of UPS room nearing completion and generator installation.

Computer room workUPS InstallationGenerator installation

Computer Room Air Conditioning
Glycol Free Cool
Direct Expansion
Chilled Water

Computer Room Power
UPS Backup Systems
Generator Support
48 Volt Systems

Fire Detection & Suppression
Fire Detection Systems
FM200
Hi-Fog
Air Aspiration

Building Works
Computer Room Floor
Partition & Doors
Suspended & MF Ceiling

Computer Room Security
Door Entry Systems
CCTV
Security Fencing

Leak Detection Systems

© ITE Projects Ltd 2008
Company registration number 5098806
1 & 2 The Barn, Oldwick, West Stoke Road, Lavent, Chichester, PO18 9AA

Computer Room Design, Server Room Design, Computer Room Air Conditioning,Computer Room Fire Detection, UPS Backup, Generator Installation, Data Centre Design, Computer Room Build